The below checklist mirrors Palmetto LightReach's full internal review process for M1 Installation Review.
All requirements must be satisfied to achieve M1, and requirements are uniform across our ecosystem.
Each item detailed below features details and additional links to specific details.
(SQ) Site Qualifying
| Item: | What We're Checking For: |
SQ1 | Account Details |
|
SQ2 | Contract Details |
|
SQ3 | Site Qualifying |
|
SQ4 | Third Party Invoice |
|
(A) Administrative
| Item: | What We're Checking For: |
A1 | Monitoring Portal Site ID |
|
A2 | Permits |
|
A3 | Incentives (I/A) | |
A4 | Utility Bill |
|
(D) Design Package Documents
For guidance on major changes that would require as built design package documents refer to Design Package | Inputs and Deliverables.
| Item: | What We're Checking For: |
D1 | Plan Set |
|
D2 | Production Model |
|
D3 | Shade Report |
|
(IP) Install Photo Documentation
| Item: | What We're Checking For: |
IP1 | Project Site | |
IP2 | Roof / Mounting System |
|
IP3 | Electrical | |
IP4 | (I/A) Storage | |
IP5 | Project Completion |
|
All requirements must be satisfied to achieve M1 Installation approval. Requirements are uniform across our ecosystem, however, the QC technician reviewing the submission may at their discretion grant conditional approvals. Conditional approvals are M1 approvals which grant leniency to submit certain missing or incomplete items at M2 Activation. Conditional approvals are automatically provided where reasonably possible.
May qualify for Conditional approval consideration: Minor missing uploads or basic installation fixes solved with a site visit
Will not qualify for Conditional approval consideration: Code violations, or violations of manufacturer specification, egregious workmanship issues, high submission error rates, etc.