This article details our current incentives deliverables required at Install (M1) milestones on all LightReach sales. There are two primary considerations:
System Pre-Requisites: Sales requirements pertaining to the system that are necessary to qualify for incentives altogether.
M1 Documents: Documents and submission items required as part of the M1 package in applicable markets.
Failure to follow pre-requisites or submit incentive requirements will result in the rejection of M1 milestone.
System Pre-Requisites by State:
State | Pre-Requisite |
CA | CA RPS Incentives
|
CT
| Connecticut RRES (Eversource & UI only)
Click to View Paperwork Pre-requisites
Click to View System Pre-requisites
|
Wash. DC | DC SREC Incentives
|
MASS. | MA CLASS I SREC Incentives
|
MD | MD SREC Incentives
|
NJ | NJ ADI/SREC-II Incentives
|
Ohio | OH AEPS Tier I Incentives
|
PA | PA AEPS Incentives
|
IL | IL Shines / ABP Incentives
|
RI | RI Net Metering
All systems must be enrolled in Net-Metering program (Not FiT/Regrowth) |
M1 Documents: Submission Requirements
Installers must ensure that (1) All required documents are present and (2) System details, where applicable, match installation & other installation documents (for example, system size on incentive docs must match system size on planset).
State | Document 1 | Document 2 |
CA
| Utility Bill
| Approved Interconnection Agreement
Click for additional notes
|
CT | Utility Bill
| Statement of Qualification (SoQ) document provided by the utility
|
Wash. DC | Utility Bill
| N/A |
IL
| Utility Bill
| Illinois Shines Disclosure Forms (2x)
Click for add'l Form B Details
|
MD | Utility Bill
| N/A |
MASS | Utility Bill
| N/A
|
NJ
| Utility Bill
| ADI Conditional Approval
|
Ohio | Utility Bill
| Recognition of Assignment (ROA)
|
PA | Utility Bill
| Recognition of Assignment (ROA)
|
RI | N/A | N/A |