Palmetto is committed to an exemplary customer experience, grounded in best-in-class asset quality and consumer support. Driving this asset quality are our robust quality control standards, starting with appropriate system sizing, a high-quality installation, and a verified start-up.
This guide walks through everything required to complete the Generator Install Package submission. It covers five components:
Install Package Documentation
Equipment & Site Photos
Installer Attestations
FieldPro Commissioning Screenshots
Customer Sign-Off
Installation Documents
Use the links and examples in this article to ensure your submission meets Palmetto's internal review standards.
Item | Deliverable |
Installation Contract or Work Order | Upload a copy of the signed installation contract or work order. The total cost of installation must be clearly stated and must equal the amount financed by Palmetto, ± $100. Deviations greater than $100 will be rejected pending clarification. |
New System Photos
Item | Deliverable |
Equipment Nameplate |
|
Cellular Device ID |
|
Wide / Pullback Shots of Generator (2–4 photos) |
|
ATS Close-Up (+ pullback if not co-located) |
|
Main Service Panel (Door Open Photo) |
|
Installer Attestations
The items below rely on installer attestation rather than a submitted document or photo. Palmetto reserves the right to request supporting documentation for QC audit.
Item | Deliverable |
Generator Sizing | Installer attests the generator is appropriately sized for backed-up loads, based on square footage. (Sizing tool used: PowerPlay at Generac.com or similar.) |
CO Detector(s) | Installer attests CO detectors are installed per local code, or per Generac installation requirements, and confirms the count installed. No photo required. |
No Conflicting Downstream Generation | Installer attests no downstream generation conflicts exist at the site — no solar, battery, or other generation source that could cause a parallel generation or backfeed conflict. |
Load Control Devices (SMMs) | Installer attests to the quantity of installed load control / smart management modules. Paired with a single pullback photo showing all installed devices. |
FieldPro Commissioning Screenshots
Mobile Link data alone is not sufficient for the items below — FieldPro screenshots are required.
Item | Deliverable |
Fuel Line Pressure Test (3 screenshots) | Three sequential FieldPro app screenshots: (1) immediately after fuel line install, showing constant pressure; (2) generator running test; (3) under-load test. All three must show a passing pressure reading. |
FieldPro Green Status (post-runtime) | A single screenshot showing all parameters green with no active alarms, captured after the generator has completed a 30-minute minimum (up to 1 hour) run, targeting 80% load capacity. |
Wi-Fi Connectivity Confirmed | A screenshot confirming Wi-Fi is connected and active at time of commissioning. (Wi-Fi is also visible in the fuel-pressure-test screenshots — this item is a deliberate double-check, since cellular activates at warranty registration and Wi-Fi is the preferred fail-safe for reliability.) |
Customer Sign-Off
Item | Deliverable |
Customer Walk-Through & Sign-Off | Installer attests the homeowner has completed a walk-through covering system operation, exercise schedule, maintenance expectations, and emergency procedures.
|