This practical guide outlines state-specific solar installation requirements—including Texas milestones from M0 through M2—detailing the necessary documentation, regulatory approvals, and compliance steps to help sales and installation teams keep projects efficient and compliant.
State | Utilities* = Lease Only | Min. Production Factor for Sales (Y1 Prod / DC kW) |
Texas | We recognize that the state of Texas electric service territories and market conditions are unique and diverse. Please use the guidance below to determine if a customer is in 'deregulated ' or retail choice area and thus eligible for LightReach PPA, or if the customer is in one of our approved municipal or cooperative utilities and eligible for a LightReach Lease. Identifying the TDU and/or verifying a Retail Electric Provider is on the PUC of Texas list is a simple way to verify. On the PUC site, the utility company name can be looked up on the REP (Retail Energy Provider) Directory, and the TDU (Transmission Distribution Utility) Directory. The TDU Coverage Map is another resource to confirm the utility territory the customer resides in.
If the bill is administered by ANY of the retail electric provider ('REP') names and DBAs on the current PUCT list, then it is a retail choice area and eligible for a LightReach PPA:
Transmission Distribution Utilities (TDUs) with Retail Energy Providers (REPs)
Municipal, Cooperative, and IOUs (full-service)
| 800 |
A | Credit Requirements |
|
Does LR offer contracts in Spanish? | Yes, Spanish contracts have launched in Texas |
Grid+ is the retail electricity plan that comes with LightReach Energy Plan in Texas. It pays homeowners for excess solar sent to the grid and adds monthly battery credits for an eligible battery. Grid+ is billed as a separate monthly electricity bill.
Required step for Texas retail choice homeowners: Every LightReach homeowner in a Texas retail choice area must either chose to enroll in Grid+ or opt out. The requirement appears in the web portal as Set up your grid plan, alongside ID, title, utility bill, and ACH setup.
*Click on link for more details
Energy Backup Homeowners: Enroll the same way through Set up your grid plan. Battery credits apply to the backup battery. Solar buyback credits apply only if the home has solar.
Texas: Third-Party Inspector (TPI) Option
Texas: Third-Party Inspector (TPI) Option
What it is: Under Texas SB 1202, a qualified TPI can handle plan review and inspections for home backup power installs (solar PV, storage, generators) on one- and two-family homes.
Key rules
Get Palmetto approval before using any TPI on LightReach projects.
The installer owns due diligence and all liability. You confirm licensing, insurance, and qualifications, and you stay responsible for the work.
Clawback risk. If the utility denies PTO because of the TPI, or the project fails a later inspection, expect cancellation, withholding, or clawbacks.
No self-inspection. The homeowner and installing contractor can’t review or inspect their own work.
Not a utility substitute. Interconnection approval is separate, and some cities still require their own permit for service or panel upgrades.
Risk. You assume all risks associated with using a TPI instead of an inspector employed by an AHJ.
Pre-approved TPIs
Texas Power Inspections | |
Aoka LLC | |
Inspected.com (My Amelia, Inc. DBA Inspected.com) |
Approval can be paused or removed at any time. Check this list before scheduling each project
How to get approved
Email [email protected] with the subject “TPI approval request: [TPI firm name].”
Pre-approved TPI: Send your executed MSA (signed directly with the TPI) and an Independence Statement.
Other TPI: Send the executed MSA, certificate of insurance, licensing evidence for each reviewer, sample plan review, sample inspection report, and Independence Statement.
Minimum requirements
License (each reviewer): Texas Master Electrician, certified Electrical Inspector, or Texas PE.
Insurance: $500K per occurrence and $1M aggregate professional liability, plus workers’ comp.
Using an unapproved TPI? Palmetto may require re-inspection at your cost.
Questions: [email protected]
State(s) | Snow Loss (Only use if design platform does not have a total value) | Minimum System Loss without Shade Loss (Includes Snow Loss) |
| 0% | 9.1% |
Lightreach has recommendations for the Battery settings based on a variety of factors; contract type, location, utility rate plan options and net metering policy, system design/configuration, etc.
Recommended battery operation mode varies by home. Some homes are not incentivized to use stored energy except during outages (e.g. 1:1 NEM with non-TOU markets) where Backup Power is desirable. California NEM 3 has customized TOU and AI Optimization modes and rate plans. While utilities with low export credits can optimize utility bill savings with Self-Consumption modes as in Texas.
*Click on link for more details
System Pre-Requisites by State:
State | Pre-Requisite |
TX | Green-e (M-RETS Incentives)
|
M1 Submission Requirements:
State | Document 1 | Document 2 |
TX | Utility Bill
| One new Milestone Requirement beginning November 1, 2026
1. Wet-Signed Consumer Disclosure Form (for customers 65+ only) • Requirement: EPC uploads the wet-signed Consumer Disclosure Form for applicable customers. • Applicability: New solar contracts generated for 65+ customers beginning November 1, 2026
• Please note, an e-signed version of the Consumer Disclosure Form will be included in all Texas Solar Contracts beginning September 1, 2026.
**Austin Energy M1
|
Requirements by State:
State | Document 1 | Document 2 |
Texas | Interconnection Agreement
| PTO
|


