Install Verification & Quality Standards
Professional installation by licensed contractors, following manufacturer requirements
Installation verification focused on safety, startup, and code-compliance
Two required photos (data plate and wide view). Other photos are optional.
Warranty registration info and permit where required
Key Disclaimers:
AVL: Installed equipment must be part of the Water Heater: Approved Vendor List (AVL)
Customer Sign-Off: Completed by the customer via their home.palmetto.com account.
The homeowner confirms the install is complete and the water heater works, through a short checklist in home.palmetto.com.
Available to the homeowner from NTP. It auto-approves 3 days after you submit the install package if the homeowner doesn't act, and homeowners can complete it on install day.
All requirements must be satisfied to achieve funding. Requirements are uniform across our ecosystem, Palmetto does not grant exceptions by request. Funding requires both QC approval and the homeowner's sign-off (or auto-approval after 3 days).
Rejections can include: Code violations, or violations of manufacturer specification, egregious workmanship issues, high submission error rates, etc.
If the wide installation view shows a possible concern (venting, drain pan, T&P discharge or clearances), it goes to a QC Lead, who aims to decide within 24 hours, weekends and holidays included. Installs that are clearly unsafe are rejected. If it's unclear, the Lead asks you for more information or another photo.
Contracts: your install contract, work order or signed invoice must match the customer's name, address and installed equipment, with a total within $100 of the financed amount. The customer contract must also show the installation date.
Installation Documentation & Photos
Every installation must be documented at time of completion to verify it meets safety, code, and warranty standards. Two photos are required: the Equipment Data Plate and the Wide Installation View. The other photos below are optional. Examples are included for each.
Item | Deliverable |
Equipment Data Plate | Clear photo showing model and serial number. Required. Model and serial must be legible. If the plate can't be photographed, a photo of the box sticker or distributor invoice is accepted.
|
Wide Installation View | Photo of the installed unit and surrounding area, confirming proper clearances and no nearby combustible materials. Required.
|
Venting (Gas & Tankless Systems) | Vent connector, pipe pitch, and termination points visible. Optional.
|
T&P Relief Valve & Discharge Pipe | Valve and discharge piping visible and installed per code. Optional.
|
Drain Pan & Drain Line | Pan and drain line visible where applicable. Optional.
|
Stand for Water Heater | Photo showing the water heater location on a metal stand. Optional.
|
Other Requirements
Item | Requirement | Proof Method |
Permit | Installation permitted where required by local AHJ | Installer Attestation |
Water & Gas Leak Testing | System tested and verified leak-free post-install | Installer Attestation |
Code Compliance | Install aligns with applicable local code (e.g., Mixing valves in certain states). | Installer Attestation |
Warranty Eligibility | Installation meets warranty requirements | Installer Attestation |
Manufacturer Registration | Info needed to register the unit | Confirmation Required (We handle registration but need the necessary deliverables) |
Startup & Safety Checks
Installers complete standard startup and safety checks per manufacturer guidance, including system fill, initial operation, and temperature setpoint confirmation.