The below checklist mirrors LightReach's full internal review process for M1s.
All requirements must be satisfied to achieve M1, and requirements are uniform across our ecosystem.
Each item detailed below features details and additional links to specific details.
(SQ) Site Qualifying
| Item: | What We're Checking For: |
SQ1 | Account Details |
|
SQ2 | Contract Details |
|
SQ3 | Site Qualifying |
|
(A) Administrative
| Item: | What We're Checking For: |
A1 | Monitoring Portal Site ID (Optional for M1, but recommended for early review) |
|
A2 | Permits |
|
A3 | Incentives (I/A) |
(D) Design Package Documents
| Item: | What We're Checking For: |
D1 | Planset |
|
D2 | Production Model |
|
D3 | Shade Report |
|
(IP) Install Photo Documentation
| Item: | What We're Checking For: |
IP1 | Project Site | |
IP2 | Roof |
|
IP3 | Electrical | |
IP4 | (I/A) Storage | |
IP5 | Commissioning |
|
All requirements must be satisfied to achieve M1. Requirements are uniform across our ecosystem, however, the QC technician reviewing the submission may at their discretion grant conditional approvals. Conditional approvals are M1 approvals which grant leniency to submit certain missing or incomplete items at M2. Conditional approvals are automatically provided where reasonably possible - LightReach does not grant exceptions by request.
May qualify for Conditional approval consideration: Minor missing uploads or basic installation fixes solved with a site visit
Will not qualify for Conditional approval consideration: Code violations, or violations of manufacturer specification, egregious workmanship issues, high submission error rates, etc.