Monitoring Site ID (M1)

Providing the monitoring site ID is required for M1. Sharing direct portal access to LightReach is encouraged but optional for M1.

Sai - LR Operations avatar
Written by Sai - LR Operations
Updated over 3 months ago

What to Submit

All installation submissions must provide:

  1. The monitoring site ID for the PV system

  2. If Battery Installed: Battery monitoring ID (*See Details below)

The monitoring ID is typically 6-7 digits, and is created from the manufacturer's monitoring site, after the site is commissioned (aka physically tested on site).

For Installation M1 submissions, monitoring site IDs are required. Sharing direct portal access (DPA) to LightReach is encouraged, but optional for M1. Full system activation and sharing direct portal acess (DPA) to LightReach is a requirement later during M2 submission.


Examples of Site IDs:

  • SolarEdge, typically 7 digits

  • Taken from the SolarEdge monitoring portal (monitoring.solaredge.com)

  • Enphase, typically 6 digits

  • Taken from the Enphase monitoring portal (enlighten.enphaseenergy.com)

  • Tesla, typically alpha numeric string

  • Taken from the Tesla monitoring portal (powerhub.energy.tesla.com)

Battery Monitoring ID (If Applicable)

If Battery & Inverter are same manufacturer: Battery monitoring ID is the same site ID number.

If Battery & Inverter are different manufacturers: There will be two separate site IDs. This will be in the same format as the above examples.

  • Enphase Inverter: Provide site ID per above sample

  • Tesla Battery: Provide site ID per above sample