Overview:
1) Installers should reference the technical installation documents from the manufacturer website for specifications.
Step by Step Guide to Reach Technical Installation Documents (click to expand)
Step by Step Guide to Reach Technical Installation Documents (click to expand)
- Use this link https://us.qcells.com/q-tron-blk-m-g2-ac/
2) Installers are responsible for obtaining certifications required to be a certified installer with QCells.
Design Requirements:
String Sizing Requirements
Maximum 11 AC modules per branch circuit (maximum 20A breaker)
1.45A max continuous output for each AC module
Voltage Rise (Refer to system design guide, VRise calculations - here)
Under 2%
Consider using 10 AWG for longer runs or if approaching 11 AC modules per branch circuit.
Maximum count per system
144 AC modules
44 for 1 x Q.Home combiner & +100 using off the shelf combiner box (see image below)
If greater than 44 - need external production CT - (P2 on GEM board).
See technical resources for specifications.
Maximum system With Battery (PW3 ONLY)
Only PW3 acceptable
7.68 AC kW per PW3
10 kW with expansion (See QCells application note - here)
Equipment location
No direct sunlight
No southern facing
Installation Requirements
AC cables (click to expand)
AC cables (click to expand)
Only use proprietary QCells AC cables.
Can run QCells AC cables up until the junction box
ONLY from the junction box to the combiner, can use non QCells AC cables.
Can run QCells AC cables direct if not using the Junction box.
For long home runs
Use the voltage rise table and ensure we do not run direct (Have to use a Jbox).
Combiner requirements
Maximum 80A DG breaker
4 x 20A breakers
Combiner requirements (click to expand)
Combiner requirements (click to expand)
Maximum 80A DG breaker
4 x 20A breakers
95A with gateway (80A DG breakers + 15A Gateway breaker)
Acceptable breaker types
Eaton (BR) ONLY
Maximum 60A (BR260) single breaker
No Quad or Triplex
Wiring & Phasing
PV2 breaker must be wired with L2 to the top breaker terminal due to its position on the bus (see image below)
Equipment location
No direct sunlight
No southern facing
Internet & Communication Requirements
Cell Modem / Cell Kit (Required for all LR projects)
Purchased separately
Install Wifi dongle as default
Needed for commissioning
Commissioning screenshots or monitoring portal verification
Connection priority
If either (or both) Ethernet or Wi-Fi & Cellular is connected.
Device will connect to the cloud via Ethernet -> Wi-Fi -> Cellular as priority. (see image below)
CT Installation Requirements (click to expand)
CT Installation Requirements (click to expand)
Specifications
200A QCell CT devices ONLY
Wire Run
Do NOT run through the same conduit as other conductors.
Consumption CT
5.2 m (CT-JS-CLAMP-200A-5.2m) or 25 m (CT-JS-CLAMP-200A-25m)
Can extend to 100 m / 300 feet - NOT RECOMMENDED
Splicing - Can splice CTs together
If matching models ONLY
Up-to 2 pairs ONLY
Recommended - 2 wire twisted (300V, 18-20 AWG)
Production CT
Pre installed in the combiner panel
External Production CT
2 m
Any production CT is NOT ALLOWED TO SPLICE / EXTEND
Consumption CT Location Requirements (click to expand)
Consumption CT Location Requirements (click to expand)
Load + Solar
CTs shall be configured to measure all home loads + solar as default.
Verify settings located in commissioning settings
Load Only
Can be configured to only measure home loads only.
In the event of any MSP constraints that do not allow for Load + Solar configuration.
Verify settings located in commissioning settings
CT polarity & Labelling
Consumption CTs - Pointing towards loads (away from source)
CTs can have polarity reversed remotely via monitoring portal or commissioning app
CT wires termination point
CT shall be terminated on the dedicated C1 & C2 terminals.
External Production CT
If installing more than 44 modules on additional strings in an off the shelf sub panel.
CT polarity & Labelling
Arrowing point away from source (PV)
CT wires termination point
CT shall be terminated on the dedicated P2 terminals
QCells AC PV + Tesla PW3 Battery (click to expand)
QCells AC PV + Tesla PW3 Battery (click to expand)
Ensure both manufacturer guidelines are followed - references linked below
Commissioning Requirements (click to expand)
Commissioning Requirements (click to expand)
Commissioning photos (if no monitoring access is provided)
Review the resources here
WiFi dongle & Cell Modem / Cell Kit needed for commissioning
Cell Kit purchased separately
PCS
Backfeed Power Limitation (Current Limit out of the combiner)
PV ONLY
PV backfeed breaker does not need to follow NEC 705.12
Example: For a 200/200A panel, backfeed breaker does not have a limit at 40A (follow AHJ discretion), as long as backfeed power limit is set at 40A.
Busbar Overload Control - Pending release (No ETA)
Monitoring Access
Admin Sign up
How EPCs will sign up
Their Admin of their company will sign up.
See instructions below for admin.
Example
Company Name: SUNNYEPC
Company address: 123 Bright Way, Sunny City, USA
Company Type: Installation, operation/management
Partner Admin Email Address: [email protected]
Partner Admin First and Last name: Sunny Sunnerson
Adding Users
Once done, they assign “users” for all employees........