SI1) Main Panel Upgrade
If an MPU is applicable. Photos should clearly show:
Close up of main breaker rating
Panel label/sticker showing busbar rating
Contextual shot of where the new upgraded panel was installed.
Interconnection method in the new panel - close up of breaker rating if back feed breaker was used.
SI2) Tree removal
During design stage, if the generated production estimation used on the contract was based on the fact that trees would be removed at or post installation, then - photos of said trees removed are required.
If tree removal is applicable. Photos should clearly show:
Stump(s) of tree(s) removed.
Contextual wide shot of the area with project site visible in the background.
SI3) Trench Path
Photo of trench depth & path if applicable.