Skip to main content

M2 Site Improvement Photos (If Applicable)

Andrew C - PLR Product Ops avatar
Written by Andrew C - PLR Product Ops
Updated over 2 months ago

M2 reviews typically require updated submissions, especially when dealing with Main Panel Upgrades or related components. To meet the requirements, ensure you provide clear documentation and address any notes regarding an MPU with either updated photos or appropriate change orders.


SI1) Main Panel Upgrade

If an MPU is applicable. Photos should clearly show:

  • Close up of main breaker rating

  • Panel label/sticker showing busbar rating

  • Contextual shot of where the new upgraded panel was installed.

  • Interconnection method in the new panel - close up of breaker rating if back feed breaker was used. When handling MPU discrepancies and corrections:

  • If an MPU was quoted but not done: Submit a change order removing the electrical adder.

SI2) Tree removal

During design stage, if the generated production estimation used on the contract was based on the fact that trees would be removed at or post installation, then - photos of said trees removed are required.

If tree removal is applicable. Photos should clearly show:

  • Stump(s) of tree(s) removed.

  • Contextual wide shot of the area with project site visible in the background.

SI3) Trench Path

  • Photo of trench depth & path if applicable.

Did this answer your question?