SI1) Main Panel Upgrade

If an MPU is applicable. Photos should clearly show:

  • Close up of main breaker rating

  • Panel label/sticker showing busbar rating

  • Contextual shot of where the new upgraded panel was installed.

  • Interconnection method in the new panel - close up of breaker rating if back feed breaker was used.

SI2) Tree removal

During design stage, if the generated production estimation used on the contract was based on the fact that trees would be removed at or post installation, then - photos of said trees removed are required.

If tree removal is applicable. Photos should clearly show:

  • Stump(s) of tree(s) removed.

  • Contextual wide shot of the area with project site visible in the background.

SI3) Trench Path

  • Photo of trench depth & path if applicable.