The Loop Field Milestone confirms that the underground geothermal loop field has been fully installed and verified before moving into indoor equipment installation.
To complete the Loop Field submission, dealers must submit documentation through the Finco Portal or API showing that the loop field meets Palmetto engineering and quality standards.
Required Deliverables
Permit Approved
Initial permit submission required
Permit Submitted Date / Approved Date
All required permits must be approved before milestone clearance.
Once the permit is approved, you will see the permit at the top of the Loop Field Package:
Driller Information
Driller Name
Driller License
β
Pressure Test Results
Note
Loop Field Photos
Provide clear installation photos showing:Trenches or boreholes before backfill
Pipe placement and fusion joints
Headers and manifold connections
Grouting setup and completion
β
Design Documents
sdf
β









