Geothermal: Loop Field Submission

The Loop Field Milestone confirms that the underground geothermal loop field has been fully installed and verified before moving into indoor equipment installation.

To complete the Loop Field submission, dealers must submit documentation through the Finco Portal or API showing that the loop field meets Palmetto engineering and quality standards.

Required Deliverables

  • Permit Approved

    • Initial permit submission required

    • Permit Submitted Date / Approved Date

    • All required permits must be approved before milestone clearance.

Once the permit is approved, you will see the permit at the top of the Loop Field Package:


  • Driller Information

    • Driller Name

    • Driller License


​


  • Pressure Test Results

    • Note


  • Loop Field Photos
    Provide clear installation photos showing:

    • Trenches or boreholes before backfill

    • Pipe placement and fusion joints

    • Headers and manifold connections

    • Grouting setup and completion
      ​


  • Design Documents

    • sdf


​